<< December 2004 >>
Sun Mon Tue Wed Thu Fri Sat
 01 02 03 04
05 06 07 08 09 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31


If you want to be updated on this weblog Enter your email here:



rss feed


Dec 9, 2004
extraction

Generally the first stage in the extraction of crude oil is to drill a well into the underground reservoir. Historically, in the USA some oil fields existed where the oil rose naturally to the surface, but most of these fields have long since been depleted. Often many wells will be drilled into the same reservoir, to ensure that the extraction rate will be economically viable. Also some wells may be used to pump water, steam or various gas mixtures into the reservoir to raise or maintain the reservoir pressure, and so maintain an economic extraction rate.

If the underground pressure in the oil reservoir is sufficient then the oil will be forced to the surface under this pressure. Gaseous fuels or natural gas are usually present, which also supplies needed underground pressure. In this situation it is sufficient to place a complex arrangement of valves on the well head to connect the well to a pipeline network for storage and processing.

Over the lifetime of the well the pressure will fall, and at some point there will be insufficient underground pressure to force the oil to the surface and the remaining oil in the well must be pumped out.

Various techniques aid in recovering oil from depleted or low pressure reservoirs, including Beam Pumps, Electrical Submersible Pumps (ESPs), and Gas Lift. Other techniques include Water Injection and Gas Re-injection, which help to maintain reservoir pressure.

 


Posted at 04:16 am by vanessarose

greensy
July 11, 2005   01:07 AM PDT
 
Very interesting information!
 

Leave a Comment:

Name


Homepage (optional)


Comments




Previous Entry Home Next Entry